MSW Feedstock Processing Facility

Sparks, Nevada

Project Overview

MSW Feedstock Processing Facility

This project totaled 93,000 SF of total building work. Cambridge upgraded and remodeled the existing 62,000 SF facility to incorporate new processing equipment and constructed a 22,000 SF inbound material tipping area addition, and a 9,000 SF addition on the other for residual outbound materials.

The new additions had cast-in-place concrete walls, heavy-duty floors, and pre-engineered metal buildings. Cambridge also installed compactors for the outbound feedstock and tippers for the inbound material. Site improvements included the relocation of an above-ground truck scale, addition of an in-ground scale, electrical service upgrades, and modifications to the stormwater conveyance system to accommodate the building additions.

Client:

Fulcrum BioEnergy, Inc.

Type of Work:

Design-Build