DESIGN WITH PURPOSE. BUILD WITH PRECISION.

From concept to completion, we deliver turnkey design-build solutions built around your facility’s unique needs.

‍Our integrated approach makes the entire process seamless, efficient, and collaborative. The result is a facility that works for your business today and tomorrow.
​
​
Explore our projects

1988

SINCE

275+

PROJECTS

42+

STATES

50+

TEAM MEMBERS
Aerial view of a hauling facility with rows of collection trucks beside wooded farmland

CAMBRIDGE WORKS WITHIN YOUR PROCUREMENT PROCESS

Two people review architectural blueprints on a table for a design-build project.

FROM CONCEPT TO COMPLETION

Line drawing of a processing building with an adjoining storage tank
​
​
Full-service support from early planning through final construction.
Renovations to an existing transfer station.

RENOVATIONS & ADDITIONS

Line drawing of a transfer building with a raised tipping deck
​
​
Upgrade or expand existing facilities while keeping operations in mind.
Interior of a processing facility with blue air-handling cyclones over labelled sorting bunkers

SPECIALIZED CONSTRUCTION MANAGEMENT

Line drawing of a renewable natural gas processing building
​
​
Expert coordination for complex projects with unique operational requirements.
Aerial view of a county transfer station with a large building featuring multiple open bays, several trucks loaded with scrap metal parked nearby, surrounding green trees, and a paved road leading to and from the site.

FOR PUBLIC-SECTOR CLIENTS

Line drawing of a metal-clad facility building
​
​
Experience navigating public procurement, compliance, and project requirements.

ONE CONTRACT. ONE CONTACT. CONCEPT TO COMPLETION.

Cambridge manages the full project from site evaluation and design through permitting, procurement, and construction. Four waste industry specialized architects on staff means design and build stay on the same team. One budget, one point of accountability, no gaps between phases.
​
​
SEE HOW WE WORK
​
01
DESIGN
​
​
​
02
PRECONSTRUCTION
​
​
​
03
PROCUREMENT
​
​
​
04
BUILD
​
​
​
05
CLOSEOUT

ALREADY HAVE A FACILITY? WE CAN MAKE IT BETTER.

Expanding a transfer station, adding a processing line, or reconfiguring site flow: Cambridge applies the same design-build process to existing facilities. We understand how waste operations work, so every addition integrates with what's already running.
​
​
EXPLORE OUR PROJECTS
BEFORE
AFTER
​

ALREADY HAVE A DESIGN TEAM? WE WILL RUN THE BUILD.

When your project already has a design team in place, Cambridge steps in as construction manager. You get a specialist who knows waste and recycling facilities managing every aspect of the build: procurement, trade partners, scheduling, and quality control.
​
​
TALK TO US
Client and design team reviewing architectural drawings.
​

CLIENT AND DESIGN TEAM

​
Construction management team in a jobsite trailer building a recycling facility.
​

CAMBRIDGE CONSTRUCTION MANAGER

​
​

COMPLETED FACILITY

WE BUILD WHERE YOU ARE ACROSS THE US

We bring our construction expertise wherever you are. With experience working across the U.S. and under a wide range of Authorities Having Jurisdiction, we know how to navigate local requirements and deliver projects efficiently.
​
​
TALK TO US
​
​
TALK TO US
​
​
VIEW OUR PROJECTS
​
​
VIEW OUR PROJECTS
Map of the United States marking Cambridge Companies office locations and projects in design, construction, and recently completed
Map of the United States marking Cambridge Companies office locations and projects in design, construction, and recently completed
Construction
Recently Completed
Design
Office Locations
​
​
TALK TO US
​
​
TALK TO US
​
​
VIEW OUR PROJECTS
​
​
VIEW OUR PROJECTS

NOT SURE WHICH MODEL FITS YOUR PROJECT? TALK TO US!

Tell us what you're planning. We will tell you how we would structure it.
​
​
866-972-1155
​
​
866-972-1155
​
​
TALK TO US
​
​
TALK TO US
Green sorting conveyors and screening equipment inside a material recovery facility
Construction of pre-engineered metal building construction (PEMB) at  transfer station for solid waste.
Construction at a material recovery facility and pouring concrete near the partially built pre-engineered metal building.
RNG Facility under construction .
Interior of a clean truck maintenance bay with a polished floor and yellow lane striping
Cambridge Companies team meeting a solid waste facility for a site visit.