




Cambridge designed and built a 27,000 SF fleet maintenance and operations facility featuring maintenance bays, locker rooms, a break area, mezzanine, and dedicated staff and operations spaces. The project also included converting an existing container shop into a wash bay, coordinating CNG fueling infrastructure, and procuring and installing all shop equipment, including a gas detection system. Located on an active site supporting more than 180 route trucks, construction was carefully staged and phased to maintain uninterrupted daily operations throughout the project.
27K SF Maintenace & Operations Facility
12 Maintenace Bays
CNG Fueling
Wash Bay
Locker Rooms & Breakroom
Admin/Offices