Cambridge completed the design-build 5,250 SF transfer station within an existing, active facility, requiring careful coordination with the client to maintain uninterrupted tipping operations throughout construction. Key features include a 12-inch tipping floor with a specialized concrete mix design and customized steel plating designed to support future tipping operations. Site improvements included a new concrete apron, fencing, and a leachate storage tank.
5,250 SF Transfer Station
12” Tipping Floor
4' Grade Separation to Loading Pit
Loading Pit Catch Basin
3,000-Gallon Underground Leachate Tank