The design-build project includes a 29,160 SF transfer station with an admin/office facility featuring an employee break room and locker rooms, plus a 10,000 SF dry storage and maintenance area. The 400 TPD waste transfer facility consists of a metal building with seven tipping bays with large overhead doors, 12’ high concrete push walls, a 16,400 SF tipping floor, and a 1,150 SF loading pit positioned 8 feet below the tipping floor.
Seven Tipping Bays
Drive Thru Load Out Tunnel
12’ Push Walls
16.4F SF Tipping Floor
10K SF Dry Storage & Maintenance Area